Temporary Road Closure: ttro789284W(TD) – Greenway, North Curry

Please follow the link to view the above road closure; https://one.network/?tm=136177085 and the link for Notice 2: https://api-gb.one.network/downloads/tm/1111/03-notice-2_136177085_3656220_bcf4e7bdc9.pdf
The order becomes effective on 18th January 2024 and will remain in force for eighteen months.

The works are expected to commence on 24th January 2024 and last for 3 days (08:00 – 18:00) to enable Barr Engineering Services to replace a pole on behalf of Airband.

The contractor has indicated that access for Emergency Services through the site is permitted on this occasion.

For any further information about this closure please contact Barr Engineering Services on 0794 462 5140, quoting reference: ttro789284W(TD).

Please note that should you require to view a closure which is more than two weeks ahead, you will need to register for free with www.One.Network